I'm installing a drop axle on a brand new 2016 International for our leasing department, started working on it yesterday afternoon. So far I have the air solenoid installed, plumbed in a pressure protected air supply to the control valve, mounted the control valve, pulled off the steps and side fairing supports, and fabricated a bracket for the pressure regulator and gauge.
I'm a little out of practice at welding aluminum but the bracket turned out alright when I was done. This is what the regulator, pressure gauge, and trailer 7 pin connector will be mounted to.
Mounted in place with regulator and gauge installed, still need to run air lines to the control valve. More to follow in a later post...